Woodland Estate Waste Water Pump Station
Client:
EDR Contracting
Consultant:
E2 Environmental
Contract:
$750,000
Duration:
August 20 – March 21
Services:
Civil Engineering
Precast and Insitu Concrete
Project Management
Brief:
Construction of a waste water pumping station, valve chamber, 35KL storage tank and electrical works for Woodland Estate Subdivision in Woodend.
Scope:
-Temporary works consisting of cofferdams 14m x 6m and 5m deep FSPIII sheet piles with well point dewatering to allow excavation.
-Construction of a concrete wet well and valve chamber along with the deising and supply of a 35KL HDPE emergency storage tank.
-Electrical and odour control installation.
-Portions of rising main, gravity inlets and watermain to the site.
-General siteworks and concrete finishes.