Woodland Estate Waste Water Pump Station

Client:
EDR Contracting

Consultant:
E2 Environmental

Contract:
$750,000

Duration:
August 20 – March 21

Services:
Civil Engineering
Precast and Insitu Concrete
Project Management

Brief:

Construction of a waste water pumping station, valve chamber, 35KL storage tank and electrical works for Woodland Estate Subdivision in Woodend.

Scope:

-Temporary works consisting of cofferdams 14m x 6m and 5m deep FSPIII sheet piles with well point dewatering to allow excavation.

-Construction of a concrete wet well and valve chamber along with the deising and supply of a 35KL HDPE emergency storage tank.

-Electrical and odour control installation.

-Portions of rising main, gravity inlets and watermain to the site.

-General siteworks and concrete finishes.